US-92EB
Accident in Tampa on Hillsborough Ave EB approaching Orient Road. Reported by FHP Troop C
Started 27 minutes ago
SR-60WB
Road construction. Right lane closed in Plant City on State Road 60 WB at SR-39 / James Redman Pkwy. Reported by 511 DOT
Started 2 hours ago
SR-684EB
Road construction. Right lane closed in Manatee on Cortez Rd / SR 684 EB before 75th St. Reported by FL511
Ends in 22 hours
US-41NB
Road construction. Two Right lanes blocked. in Tampa Bay on US 41 NB before 57th Ave W. Reported by FL511
Ends in 21 hours
SR-70EB
Road construction. Right turn lane blocked. in Tampa Bay on State Road 70 EB before 33rd St E. Reported by FL511
Ends in 21 hours
SR-64EB
Road construction. Right lane blocked in Bradenton on SR 64 EB between 57th Street East and I-75. Reported by FL511
Ends in 21 hours
SR-31NB
Bridge closed in Lee (FT Myers Shores) on State Road 31 NB between Palm Beach Blvd (SR 80) and Bayshore Road (SR 78). Reported by FL511
Ends in 21 hours
SR-31SB
Bridge closed in Lee (FT Myers Shores) on State Road 31 SB between Bayshore Road (SR 78) and Palm Beach Blvd (SR 80). Reported by FL511
Ends in 21 hours
US-41NB
Road construction. Left lane closed in Tampa Bay on US 41 NB before Martin Luther King Ave/9th Ave W. Reported by FL511
Ends in 12 hours
54th Ave NWB
On-ramp closed in St Petersburg on 54th Ave North WB on-ramp from SB I-275. Reported by FDOT Tampa Bay
Ends in 3 weeks
I-275SB
Off-ramp closed in Pinellas on I-275 SB off-ramp to 54th Ave N (Mm26). Reported by FDOT Tampa Bay
Ends in 3 weeks
US-41SB
Road construction. Right lane closed in Sarasota on US 41 SB at Myrtle St. Reported by FL511
Ends in 3 days
US-17Both NB/SB
Long-term road construction in Polk on Hwy 17-92 NB/SB after CO Hwy 557/Haines Blvd to past Hwy 17/5th St. Reported by DOT
Ends in 3 weeks
CR-575Both NB/SB
Closed due to road construction in Trilcoochee on Trilby Rd/Burwell Rd (CR 575) NB/SB between Breeden Rd. and US 301. Reported by FDOT Tampa Bay
Ends in 3 weeks
I-275SB
Long-term road construction in Tampa on I-275 SB to EB I-4. Reported by FDOT Tampa Bay
Ends in 3 weeks
I-4WB
Long-term road construction in Hillsborough on I-4 WB to NB & SB I-275. Reported by FDOT Tampa Bay
Ends in 2 weeks
I-275Both NB/SB
Road construction in Palmetto on I-275 NB/SB before 36th Ave E and near US 19 (Mm5). Reported by FDOT
Ends in 2 weeks
US-301Both NB/SB
Paving operations in Riverview on US 301 (M/H/P) NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd. Reported by 511 DOT
Ends in 2 weeks
I-275Both NB/SB
Long-term road construction in Pinellas on I-275 NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32). Reported by FDOT Tampa Bay
Ends in 2 weeks
Price BlvdWB
Long-term road construction in Sarasota on Price Blvd WB between Toledo Blade Blvd and Sumter Blvd. Reported by FL511
Ends in 2 weeks